Software Testing Genius

admin

ISTQB Certification Exam-Sample Papers Q. 141 to lớn 150

(Quickly Review Your Skills before appearing for ISTQB Certification Exam)

Set of 10 Questions.

Correct Answers to lớn Earlier Questions – Q. 131 to lớn Q 140 are at the kết thúc of this page:

Q. 141: A formal assessment of a work product conducted by one or more qualified independent reviewer to lớn detect defects.

A. Inspection.
B. Walkthrough.
C. Review
D. Non Conformance

<<<<<< =================== >>>>>>

Q. 142: Which  of the  following  are  MAJOR  test  implementation  and  execution  tasks?

I. Repeating  test  activities
II. Creating  test  suites
III. Reporting  discrepancies
IV. Logging  the  outcome
V. Analyzing  lessons  learned

A. II, III and IV
B. I, III, IV and V
C. I, II, III and IV
D. III, IV and V

<<<<<< =================== >>>>>>

Q. 143: Which  tasks  are  performed  by  a  test  leader  versus  a  tester?

S. Writing a  project  test  strategy
T. Selecting  tools to lớn  support testing
U. Preparing  and  acquiring  data
V. Scheduling  tests

A. Test leader: S and V; Tester: T and U
B. Test leader: S, T and V; Tester: U
C. Test leader: S, U and V; Tester: T
D. Test leader: S; Tester: T, U and V

<<<<<< =================== >>>>>>

Q. 144: What type of tools to lớn be used for Regression Testing

A. Performance
B. Record/Playback
C. A. và B.
D. None

<<<<<< =================== >>>>>>

Q. 145: System Integration testing should be done after

A. Integration testing
B. System testing
C. Unit testing
D. Component integration testing

<<<<<< =================== >>>>>>

Q. 146: During this sự kiện the entire system is tested to lớn verify that all functional information structural and quality requirements have been met. A predetermined combination of tests is designed that when executed successfully satisfy management that the system meets specifications

A. Validation Testing
B. Integration Testing
C. User Acceptance Testing
D. System Testing

<<<<<< =================== >>>>>>

Q. 147: What is the normal order of activities in which software testing is organized?

A. Unit, integration, system, validation
B. System, integration, unit, validation
C. Unit, integration, validation, system
D. None of the above

<<<<<< =================== >>>>>>

Q. 148: During testing, a defect was found in which the system crashed when the network got disconnected while receiving data from the server. The defect was fixed by correcting functionality which checks the network availability during data transfer. Existing test cases did cover 100% of the module statements. To verify the fix and ensure more extensive coverage, some tests were designed and added to lớn the test suite. What types of testing are mentioned above?

I. Functional testing

II. Structural testing

III. Confirmation testing

IV. Performance testing

A. I, III and IV

B. I and III

C. II and IV

D. I, II and III

<<<<<< =================== >>>>>>

Q. 149: What  is a  scripting  technique  that  uses  data  files to lớn  contain  not  only  test  data  and expected  results,  but  also  keywords  related  to the  application  being  tested?

A. Automation  technique
B. Scripting  language
C. Process-driven  testing
D. Keyword-driven  testing

<<<<<< =================== >>>>>>

Q. 150: The principal attributes of tools and automation are

A. Speed và efficiency
B. Accuracy và precision
C. All of the above
D. None of the above

Correct Answer of the above Questions

Access the Full Database of all Questions

Correct Answers to lớn the Earlier Questions – Q. 131 to lớn Q 140 are as under:

Question No. Correct Answer
Q. 131 D
Q. 132 C
Q. 133 B
Q. 134 A
Q. 135 C
Q. 136 D
Q. 137 C
Q. 138 C
Q. 139 C
Q. 140 D

4.5 6 votes

Article Rating